Wednesday, March 19, 2014

It's all built

After 3 long days of extremely hard work, the beds are built and stacked. There was much remeasuring and recutting as well as having to unassemble the top bunk. It's finally done though. With paint, we are right around $300 in materials. Labor was free, kind of. (All of our body aches will catch up soon.) Our next step is to putty all of the screw holes, knots, and gaps.



No comments:

Post a Comment